3 2 1 I N T E R I O R S

Portfolio

Our Projects

We started out in 2023 with one goal: to create spaces that work better and feel better for all
Residential

Al Alka Project

Project date : May 2026

Duration : 4 months

A renovation project for an existing space that was dated over time. The layout stayed as it is. Our focus was on modernizing the finishes: new vanities and bathroom fittings were installed, wardrobes were relaminated, and a slatted timber partition was added to mark the entry without closing it off, carried through with matching wood-framed open shelving connecting the kitchen to the living space. Painting and AC work rounded out the scope.

A straightforward scope, delivered without disrupting the existing layout. The result is a fully upgraded space without any structural changes.

Year
2026
Location
TECOM
Residential

Noora Project

Project date : April 2026

Duration : 4 months

A 3-bedroom renovation at Al Habtoor City. The kitchen got a full reconfiguration — entrance opening relocated, finished with a waterfall counter and mauve cabinetry. Bathroom finishes were refreshed, with painting and AC servicing rounding out the scope.

The structural changes optimized the flow of the apartment, creating a much brighter and more open layout. All essential systems and surfaces were meticulously brought up to a premium, move-in-ready standard.

Year
2026
Location
Habtoor City
Corporate

Al Barsha


Project date : March 2026

Duration : 3 months

A residential villa in JVC reworked into a fully functioning office space. The transformation covered electrical works, interiors, painting, and gypsum works, delivered in a contemporary style suited for a corporate setting.

Every detail was tailored to meet modern corporate standards while retaining the property's unique structural charm. The result is a sophisticated, ready-to-use workspace that perfectly reflects the client's corporate identity.


Year
2026
Location
JVC
Residential

Jumeirah Villa

Project date - February 2024

Duration - 6 months

A villa renovation in Jumeirah Islands, giving the interiors a full refresh alongside select structural updates. Bathrooms were finished in marble with countertop basins, bedrooms finished in warm neutral tones with a custom walk-in dressing area, and a games and lounge room laid with herringbone flooring for a playful contrast. Outdoors, the pool deck and garden were refreshed alongside painting throughout the villa.

The project seamlessly connects the upgraded indoor spaces with the refreshed outdoor areas. The entire villa now feels completely unified, modern, and ready to enjoy.

Year
2024
Location
Jumeirah

Subscribe

Office

Warehouse 3, Street 59 - Mina Jebel Ali - Jabal Ali Industrial First - Dubai


© 321 INTERIORS . 2026