3 2 1 I N T E R I O R S

Our Projects

Residential

Al Alka Project

Project date : May 2026

Duration : 4 months

A renovation project for an existing space that was dated over time. The layout stayed as it is. Our focus was on modernizing the finishes: new vanities and bathroom fittings were installed, wardrobes were relaminated, and a slatted timber partition was added to mark the entry without closing it off, carried through with matching wood-framed open shelving connecting the kitchen to the living space. Painting and AC work rounded out the scope.

A straightforward scope, delivered without disrupting the existing layout. The result is a fully upgraded space without any structural changes.

Year
2026
Location
TECOM
Residential

Noora Project

Project date : April 2026

Duration : 4 months

A 3-bedroom renovation at Al Habtoor City. The kitchen got a full reconfiguration — entrance opening relocated, finished with a waterfall counter and mauve cabinetry. Bathroom finishes were refreshed, with painting and AC servicing rounding out the scope.

The structural changes optimized the flow of the apartment, creating a much brighter and more open layout. All essential systems and surfaces were meticulously brought up to a premium, move-in-ready standard.

Year
2026
Location
Habtoor City
Corporate

Al Barsha


Project date : March 2026

Duration : 3 months

A residential villa in JVC reworked into a fully functioning office space. The transformation covered electrical works, interiors, painting, and gypsum works, delivered in a contemporary style suited for a corporate setting.

Every detail was tailored to meet modern corporate standards while retaining the property's unique structural charm. The result is a sophisticated, ready-to-use workspace that perfectly reflects the client's corporate identity.


Year
2026
Location
JVC
Residential

Jumeirah Villa

Project date - February 2024

Duration - 6 months

A villa renovation in Jumeirah Islands, giving the interiors a full refresh alongside select structural updates. Bathrooms were finished in marble with countertop basins, bedrooms finished in warm neutral tones with a custom walk-in dressing area, and a games and lounge room laid with herringbone flooring for a playful contrast. Outdoors, the pool deck and garden were refreshed alongside painting throughout the villa. 

The project seamlessly connects the upgraded indoor spaces with the refreshed outdoor areas. The entire villa now feels completely unified, modern, and ready to enjoy.

Year
2024
Location
Jumeirah

Al Alka Project

Project date: May 2026

 

Description: A dated space refreshed with its original layout intact. The bathrooms were fitted with new vanities and fixtures, the wardrobes were refinished in new laminate, and the walls were repainted, with air conditioning works carried out throughout. An added timber slat screen defines the entrance without enclosing it, and open timber shelving connects the kitchen to the living area.

Noora Project

Project date: April 2026

 

Description: A three bedroom apartment at Al Habtoor City, reworked into a brighter, more open layout and ready to move into. The bathroom finishes were refreshed and the walls repainted, with AC servicing carried out throughout. The kitchen entrance was relocated and the kitchen fully reconfigured, finished with a waterfall counter and mauve cabinetry.

Al Barsha

Project date: March 2026

 

Description: A villa in Barsha South, renovated mainly on the inside. All four bathrooms were redone and the interiors refreshed throughout, with the landscaping updated to match, so the home feels cohesive from the entrance to the garden.

Al Mass

Project date: November 2025

 

Description: A renovation that renewed the space from the surfaces in. The bathroom was fully redone with the powder room updated alongside it, the kitchen and cupboards were refinished, and new flooring ties the rooms together.

Jade Villa - JVC

Project date: March 2026

 

Description: A villa transformed into an office, with the workspaces curated around how a team works. Each area was planned to support focus and everyday efficiency, and the villa now functions as a workplace from the entrance through to the last room.

Milano - JVC 

Project date: July 2026

 

Description: An interiors refresh. Pieces that didn’t suit the layout were removed and replaced with furniture chosen to fit it, leaving the space lighter and more open.The result is a home that finally feels cozy and embracing.

23 Marina

Project date: November 2025

 

Description: An apartment at 23 Marina, renovated in full from the flooring up. The hall and the bedrooms each have their own flooring, chosen for the space, with the interiors refreshed throughout, so the home feels cohesive from the entrance to every space between.

 

Jumeirah Villa

Project date: February 2024

 

Description: A villa in the Jumeirah Islands, renovated with a full interior refresh and select structural updates, and now one connected home from the living spaces out to the garden. Natural stone bathrooms and warm neutral bedrooms set a calm, refined tone, while the games and lounge room, laid with herringbone flooring, adds a playful contrast.

Subscribe

Office

Warehouse 3, Street 59 - Mina Jebel Ali - Jabal Ali Industrial First - Dubai


© 321 INTERIORS . 2026